MV CUBICLE PROJECT: READY FOR LAUNCH
The ARUM team has fully completed the preparation for the launch of the project of the 6-10 kV switchgear MV cubicle.
We have refine the design after prototyping. 11 patents applied.
A small series was produced. The cubicle was successfully tested.
The accessories and a full range of accessories have been developed.
ARUM consider proposals for joint implementation of the project.
Leave a Reply